No | Nama Peserta | K | A | T | ST | P | PT | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. Nabiel Engineering Consultant - 02.984.042.8-201.000 | 44,65 | |
|
Nilai Teknis Tidak Memenuhi Ambang Batas / Passing Grade (< 70) | ||||||
2 | PT. ANDALAN MITRA NUSANTARA - 31.298.153.3-542.000 | |
|
||||||||
3 | PT. Tata Nusa Consultant - 75.548.950.7-524.000 | |
|
||||||||
4 | CV. INTIKARYA TIGAMITRA - 01.580.769.6-201.000 | |
|
||||||||
5 | PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 | |
|
||||||||
6 | CV. FERINA KONTRAKTOR - 01.268.582.2-203.000 | |
|
||||||||
7 | CV.POLY ARSITEKTUR - 01.230.106.5-201.000 | |
|
||||||||
8 | CV. Bumi Reka Serasi - 03.038.676.7-201.000 | |
|
||||||||
9 | PT. MULTI MITRA SERASI CONSULTANT - 80.742.886.7-201.000 | |
|
||||||||
10 | CV. DIMIANO KONSULTAN - 02.558.462.4-216.000 | |
|
||||||||
11 | PT.MULTI SARANA KONSULTAN - 02.886.085.6-216.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak